Deckwood Australia Deckwood Australia Deckwood Australia Deckwood Australia Deckwood Australia

All Galleries › Decking Projects › Kumbartcho Dam

Bridge sections ready for instalation

Bridge sections ready for instal…

Craning in the walk-bridge

Craning in the walk-bridge

Erection of the walk-bridge

Erection of the walk-bridge

Completed walk-bridge

Completed walk-bridge

Walkbridge from water-side

Walkbridge from water-side

Walkway Refurbishment Kumbartcho Dam at Everton Hills
Client:Morteton Bay Regional Council
Boardwalk Systems:Outdoor Structures Australia
Engineering:Westera Partners

As part of the refurbishment of Kumbartcho Dam at Everton Hills, an old timber walkway was replaced with a new OSA hardwood boardwalk. The walkway, which incorporates Deckwood and Joistwood uses OSA's Ballina style handrail. The timber walkway was fully prefabricated at our premises and lifted into place.

Please contact Deckwood Australia for additional information.

Menu
Resource: deckwood.com.au/timber-project-gallery.php Printed: 2024-03-29
©2016-2024 Deckwood Australia All rights Reserved.